Heritage Site Retrofit
All Case Studies
Project
Heritage Site Retrofit – Mitsubishi S16R-PTAW2 Installation
Engine Size
S16R-PTAW2 – 3 units
Sector
Government / Research Infrastructure (Historical Site)
Project Overview
The client required a fast-turnaround retrofit of an emissions and noise control system at a high-security, historically protected facility. Existing silencers had to be removed and replaced, with new roof-mounted SCR systems installed within 48 hours—without disrupting operations of a critical research site.
Solution Provided
E.I. Williams/IMS engineered solutions are smarter, cleaner and quieter! For ease of installations, three compact airless SCR systems with integrated silencers were pre-mounted on skids for rapid rooftop installation. A single 5,000-liter DEF tank with dual-feed capability was used to supply all three systems to save the costs. The solution featured advanced acoustic engineering and full real-time diagnostics to ensure emissions and operational compliance under tight timelines.
System Specification
Results & Impact
All Case Studies
Interested in a similar project?
Let’s talk about how our turnkey airless SCR systems can deliver compliant, low-noise emissions control for your facility.